Description
The project included demolishing 5,000 ft² of 1980s single-storey offices and constructing a new 30,000 ft² three-storey office extension. Works included structural steel, roofing, cladding, 3,000 m² of raised access flooring, and a curtain wall on the main elevation. The A-rated building will featured modern airtightness, heat recovery, and air circulation systems. High-quality finishes included ceramic floor tiling, stainless steel handrails, bespoke glass stairwells, and solid ash joinery. Additional works included two passenger lifts, drainage, a 160-space car park, and a new ESB substation with pipework under a public road to ESB and roadway specifications.